Skip to main content
NewsRenewable Energies

Execution of trenches and laying of cables in FPV San Serván

By 29/06/2022No Comments

We kick off our intervention in one of the reference projects in Renewables in the Extremadura region: PFV San Serván, a 120 MW park promoted by the FRV company in Solana de los Barros (Badajoz).

This new project also means for Motian the beginning of relations with a new client, Grupo Ortiz, chosen by FRV as the EPC company to carry out the execution of the plants and the energy evacuation infrastructure, in addition to their maintenance. for a period of two years.

Our mission in this project is the execution of trenches, lines and Low Voltage (LV) connections. The work of creating the different types of trenches includes the installation of corrugated pipe and the filling of the excavation with screened earth from the same trenches. Our new electrical division will be in charge of laying cables of different diameters and configurations, which are conducted through corrugated tubes that we will previously extend along the trenches, to finally connect the wiring system to the weather station, auxiliary station, inverters, frames of NCU’s and other components. We also take care of the installation of a prefabricated concrete drainage box.

As always, we will do our best to satisfy the needs of our client, in this case Grupo Ortiz.