Skip to main content
Hydraulic WorkNews

New regeneration of beaches located south of the Llobregat river

By 29/06/2022No Comments

One more year we are in charge of the regeneration of beaches located to the south of the Llobregat river, in support of our client Rohde Nielsen, with whom we maintain a long relationship. The works consist of dredging sand from the seabed by means of a ship anchored a few miles from the coast.

Once the sand has been accumulated on the beach, we go into action. We have deployed a battery of backhoes and specialized personnel, in charge of the distribution, leveling and conditioning of the sand.

This work is part of the project for dredging works of 200,000 m3 for the period 2022-2023 and additionally, in the event of an extension, of 100,000 more m3 for the year 2024, with the aim of contributing them to the stretch of coast located to the south of the drainage of the Ricarda lagoon.