Project carried out by Motian in Public Works
Technical description
Construction of 500 m2 of concrete block surface, reinforced with “Murpha” mesh every 4 horizontal courses. Outside, increase in the height of the sidewalk, in the area of the loading and unloading platform, with HA 250 concrete.
LOCATION
Seville
EXECUTION TIME
2 months