Technical description
Execution of trench, placement of tubes and pipes of different types. Execution of wells and scuppers. Covering of trenches with material from the excavation itself. Loading and transport of surplus material. Adaptation and completion of the urban area.
LOCATION
Dos Hermanas (Seville)
EXECUTION TIME
8 months