Technical description
Creation of pipeline infrastructure for connection with a photovoltaic plant
Excavation of 150 km of trenches of various widths and subsequently covering the entire length of the same. Opening 50 km of roads, as well as platforms for processing centres. Support for completing the on-site safety system and the laying of electrical conduits.
LOCATION
Vaqueiros (Portugal)
COMPLETION PERIOD
3 months