Technical description
Restoring the El Toril quary
Excavation, transport, emptying and subsequent spreading of collected soil in the lower areas of the quary. Complex work due to the steep slopes of the land and the drainage system that must be perfectly structured.
UBICATION
Seville (Spain)
COMPLETED PERIOD
4 months